Current Projects

Massachusetts College of Art and Design
Smith Hall HVAC Repairs and Replacement
Project Number: MCAD-0917-21
Status: Design
Architect: DHK Architects
Construction Manager: TBD
Owner's Project Manager: C3 - Commercial Construction Consulting
Project Manager: Amanda Forde

Project shall include the replacement of the existing rooftop chiller at Smith Hall, updating the
automatic temperate controls and repair/replacement of student room fan coil units as required. Chiller
and fan coil units as identified as beyond their service life on the MSCBA Building database. Updating
controls will allow for centralized control of individual room temperatures and save on overall energy
costs. MSCBA will contract the architectural services from the recent SCBA-0918 - MSCBA On-Call
Designers Submissions RFP. The General Contractor will be procured under Chapter 149.




Recent News

MSCBA | 10 High Street, Suite 201 - Boston, MA 02110 - Phone: (617) 542-1081 - Fax: (978) 735-2156 E-mail us Directions
© Copyright 2005 - 2021, MSCBA. All rights reserved. | Disclaimer