Current Projects

Framingham State University
Peirce & Mann Fire Pump Replacement
Project Number: FRA-0921-21
Completion date: Summer, 2021
Status: Construction
Architect: Studio Enee
Construction Manager: TBD
Owner's Project Manager: C3 - Commercial Construction Consulting
Project Manager: Amanda Forde

Project shall include the replacement of the existing fire pump in Crocker Hall. The water service for
Peirce and Mann Halls is located in the lower level of Crocker Hall. Each building has a separate
underground service tunnel which includes the piping from the fire pump. The fire pump being replaced
services both buildings but not Crocker. MSCBA will contract the architectural services from the recent
SCBA-0918 - MSCBA On-Call Designers Submissions RFP. The General Contractor will be procured under
Chapter 149.




Recent News

MSCBA | 10 High Street, Suite 201 - Boston, MA 02110 - Phone: (617) 542-1081 - Fax: (978) 735-2156 E-mail us Directions
© Copyright 2005 - 2024, MSCBA. All rights reserved. | Disclaimer