Massachusetts College of Liberal Arts
Berkshire Towers Elevator Replacement
Project Number: MCLA 0907-20
Completion date: Summer, 2021
Status: Construction
Architect: Livermore Edwards & Associates
Construction Manager: D A Sullivan & Sons
Owner's Project Manager: C3 - Commercial Construction Consulting
Project Manager: Paul Forgione

The MSCBA commissioned an Elevator study for Hoosac Hall and Berkshire Towers from VDA Consulting. The study indicated the Berkshire Towers elevators should be considered for a long term modernization within the next two to four years. Due to recurring maintenance issues with both A and B Towers elevators in early March 2020 we are proceeding with renewal design immediately. This renewal/replacement is being planned for May 2021. MSCBA Has contracted with VDA and Livermore Edwards for the elevator design. The General Contractor D.A. Sullivan was chosen under Chapter 149.




Recent News

MSCBA | 10 High Street, Suite 201 - Boston, MA 02110 - Phone: (617) 542-1081 - Fax: (978) 735-2156 E-mail us Directions
© Copyright 2005 - 2024, MSCBA. All rights reserved. | Disclaimer