Current Projects

Massachusetts College of Art and Design
Starbucks Fitout
Project Number: MCAD-0949-22
Completion date: Summer, 2023
Status: Construction
Architect: Miller Dyer Spears
Construction Manager: GWV
Owner's Project Manager: STV

The project is the tenant fit-out of a Starbucks inside the Kennedy Campus Center at Massachusetts College of Art and Design in Boston, Massachusetts. Work includes demo of existing Peets Café, reconfiguration of MEP systems, installation of millwork package




Recent News

MSCBA | 10 High Street, Suite 201 - Boston, MA 02110 - Phone: (617) 542-1081 - Fax: (978) 735-2156 E-mail us Directions
© Copyright 2005 - 2024, MSCBA. All rights reserved. | Disclaimer