Current Projects

Fitchburg State University
Main Street Theater Renovations
Project Number: FIT-0828-18
Completion date: Summer, 2022
Status: Construction
Architect: ICON
Owner's Project Manager: Pinck & Co.

The theater building was constructed in 1927, and has sat abandoned for the past 30 years, during which time it has suffered significant deterioration. This project will begin with Schematic Design and may proceed into Design Development and subsequent phases of the project as approved by the University and subject to the acquisition of financing. The goal of the Schematic Design phase is to identify best and most feasible uses of the theater and abutting commercial space, develop a schematic design to serve those uses, and develop a project cost based on schematic drawings.




Recent News
No recent news is currently available.


MSCBA | 253 Summer Street, Suite 300 - Boston, MA 02210 - Phone: (617) 542-1081 - Fax: (978) 735-2156 E-mail us Directions
© Copyright 2005 - 2019, MSCBA. All rights reserved. | Disclaimer